Resources

Biodiversity Net Gain rules have changed: Is your planning application ready?

Changes to England’s Biodiversity Net Gain (BNG) rules came into force on 6 August 2026, introducing new BNG exemptions for certain smaller and temporary developments, alongside other changes to the mandatory Biodiversity Net Gain requirements.
August 10, 2026
Biodiversity Net Gain
For developers, landowners, investors and owner occupiers submitting planning applications, it is important to understand whether one of the new Biodiversity Net Gain exemptions applies to your scheme or whether your development must still deliver the mandatory 10% Biodiversity Net Gain.

While the latest changes are intended to reduce the burden on some smaller schemes, BNG remains an important consideration for development across England, and one which should be addressed from the outset of the planning process.

So, what are the latest BNG exemptions, which developments are exempt and what should you be doing before submitting your next planning application? Sarah Isherwood, Planning Partner at Vail Williams, explains.

What is Biodiversity Net Gain (BNG)?

Biodiversity Net Gain is an approach to development which seeks to leave the natural environment in a measurably better condition than it was beforehand.

Mandatory BNG was introduced in England for most major developments in February 2024 and for small sites from April 2024.

Unless a development is exempt, developers are generally required to deliver a minimum 10% Biodiversity Net Gain, calculated using the statutory biodiversity metric.

The principle is not simply to compensate for habitat lost through development, but to ensure that the overall biodiversity value following development is at least 10% greater than the site’s baseline value.

This means BNG can have implications for site design, development density, viability, land requirements, planning strategy and project timescales.

It is therefore something which developers and landowners should consider at an early stage, not once a planning application is ready for submission.

What changed to Biodiversity Net Gain rules on 6 August 2026?

The Government has amended the BNG regime following concerns about the administrative and viability burden it can place on smaller developments.

The changes apply to new planning applications submitted on or after 6 August 2026 and include four significant amendments.

These changes mean it is particularly important to establish which Biodiversity Net Gain requirements apply before progressing a scheme, rather than relying on the position that applied to an earlier development or planning application.

New 0.2 hectare BNG exemption

Development sites with a red line boundary of 0.2 hectares or less are now exempt from mandatory BNG.

There is, however, an important exception. The exemption does not apply where development negatively impacts priority habitat on the site.

This represents a significant change for smaller development projects which previously may have been required to calculate and deliver mandatory BNG despite their limited scale.

New exemption for temporary development

A new exemption has also been introduced for qualifying temporary developments where the whole development is temporary and planning permission is granted for five years or less.

Again, this exemption does not apply where priority habitat on the site is negatively impacted.

For landowners and developers considering temporary uses, this could remove an additional layer of cost and complexity from the planning process.

Greater flexibility for minor development

The Government has also changed the biodiversity gain hierarchy for minor developments.

Previously, the hierarchy placed a preference on delivering biodiversity gains on site before looking to off-site solutions.

From 6 August, minor developments which are not otherwise exempt can consider on-site and off-site options at the same time. This means they can choose to deliver BNG off site without first having to demonstrate that on-site provision has been prioritised.

This could provide considerably more flexibility where achieving the required BNG on site would constrain development or adversely affect scheme viability.

It may also help to reduce delays for some minor planning applications where securing BNG previously required more complex arrangements.

Self-build and custom-build BNG exemption removed

While some of the changes relax the BNG requirements, one amendment brings more development into the regime.

The previous exemption for qualifying self-build and custom-build development has been removed for new planning applications made on or after 6 August 2026.

Those promoting self-build or custom-build schemes therefore need to check carefully how the BNG requirements now apply to their proposals.

Which developments are exempt from Biodiversity Net Gain?

Not every planning application is subject to mandatory BNG.

Following the changes introduced on 6 August 2026, qualifying development on sites with a red line boundary of 0.2 hectares or less may benefit from a Biodiversity Net Gain exemption, as can certain temporary developments where planning permission is granted for no more than five years.

Other BNG exemptions also exist within the regime.

It is important, therefore, not to assume that BNG either does or does not apply based solely on the size or nature of a development.

Particular care is needed where priority habitat could be affected, since this can prevent a development from benefiting from the new small-site or temporary development exemptions.

Establishing whether an exemption applies should be one of the first considerations when preparing your planning strategy.

What does the 10% Biodiversity Net Gain requirement mean?

Where your development is not exempt from mandatory BNG, you will generally need to demonstrate how it will achieve at least 10% Biodiversity Net Gain.

The starting point is understanding the existing biodiversity value of the site.

This is assessed using the statutory biodiversity metric, which compares the site’s pre-development biodiversity value with its proposed post-development value.

The calculation takes account of factors such as the type, size, condition and strategic significance of habitats. This means the implications of BNG can vary significantly from one development site to another.

Carrying out the necessary BNG assessment at an early stage can help developers establish the biodiversity baseline, identify potential constraints and understand how the 10% requirement could affect the proposed scheme.

How can developers achieve 10% BNG?

There are three principal ways in which the required biodiversity gain can be delivered.

On-site BNG involves creating or enhancing habitats within the development’s red line boundary.

Off-site BNG involves securing registered biodiversity gains elsewhere, either on land controlled by the developer or through the purchase of biodiversity units from another landowner.

Statutory biodiversity credits can be purchased from Government as a last resort where the necessary gain cannot be secured through on-site or off-site provision.

For most developments, significant on-site habitat enhancements and off-site gains must be secured and maintained for at least 30 years.

The most appropriate solution will depend on the characteristics of the site, the development proposed and the wider commercial and planning strategy.

Why was Biodiversity Net Gain introduced?

BNG forms part of the Government’s wider approach to addressing habitat loss and supporting nature recovery while enabling development to take place.

Instead of development simply mitigating its impact on the natural environment, the regime seeks to ensure that development makes a measurable positive contribution to biodiversity.

However, since mandatory BNG was introduced, concerns have been raised about the disproportionate impact of the requirements on smaller developments.

The latest reforms seek to address some of these concerns by reducing administrative and cost burdens for the smallest schemes while retaining the core principle of biodiversity enhancement across development more broadly.

What do developers and landowners need to do before submitting a planning application?

The most important step is to consider BNG early in the planning process.

Do not wait until your planning application is ready for submission to establish whether BNG applies or how you are going to achieve it.

Before progressing an application, developers and landowners should consider:

  • Whether the proposed development is subject to mandatory BNG or qualifies for a BNG exemption.
  • Whether priority habitat is present which could affect the ability to rely on an exemption.
  • The site’s existing biodiversity value and how the proposed development will affect it.
  • Whether the required biodiversity gain can realistically be delivered within the site.
  • Whether off-site biodiversity units may be required and the potential cost implications.
  • How BNG could affect development design, density, viability and programme.
  • What information will need to accompany the planning application.
  • What will subsequently be required through the Biodiversity Gain Plan.

Where BNG applies, specified biodiversity information will need to be provided as part of the planning process.

What is a Biodiversity Gain Plan?

Following the grant of planning permission, a Biodiversity Gain Plan will generally need to be submitted to and approved by the local planning authority before development can commence where mandatory BNG applies.

The plan sets out how the development will achieve the required Biodiversity Net Gain, including the measures being used to deliver the necessary biodiversity units.

It therefore forms an important part of the BNG planning process and should be considered alongside the wider planning, design and viability strategy for the site.

Addressing these issues early can help reduce the risk of redesign, unexpected costs and delays later in the planning process.

Are further Biodiversity Net Gain changes coming?

Potentially.

The BNG framework continues to evolve, with Government having consulted on further changes to the regime.

These have included potential additional exemptions and changes to the way BNG is calculated, as well as proposals relating to certain residential development on brownfield land. *The Government’s consultation on a potential targeted residential brownfield exemption closed on 10 June 2026 and is still being considered.

Developers, investors and landowners should therefore keep the position under review when bringing sites forward, rather than relying on their understanding of the BNG regime from an earlier planning application.

Need help with Biodiversity Net Gain and your planning application?

The changes introduced on 6 August will simplify the position for some smaller developments, but they also make it important to establish exactly which Biodiversity Net Gain rules and exemptions apply to your scheme before progressing through the planning process.

Whether you are a developer, landowner, investor or owner occupier, early consideration of BNG can help you understand the planning, design, cost and viability implications of your proposals and identify the most appropriate route to securing planning permission.

If you are preparing a planning application and are unsure whether the Biodiversity Net Gain requirements or exemptions apply, speak to our planning experts. Vail Williams can help you understand the latest BNG rules and exemptions and consider their implications for your site, development strategy and planning application. Get in touch for more information.

Biodiversity Net Gain FAQs

Does Biodiversity Net Gain apply to all planning applications?

No. There are exemptions from mandatory BNG, including certain developments on sites of 0.2 hectares or less following the changes introduced on 6 August 2026. Whether an exemption applies will depend on the circumstances of the development.

How much Biodiversity Net Gain is required?

Where mandatory BNG applies, development must generally deliver at least 10% Biodiversity Net Gain compared with the site’s pre-development biodiversity value.

Is Biodiversity Net Gain required on small sites?

Not necessarily. From 6 August 2026, qualifying development on sites with a red line boundary of 0.2 hectares or less is exempt from mandatory BNG, provided the development does not negatively impact priority habitat.

Small developments which do not qualify for an exemption may still be subject to mandatory BNG.

Can Biodiversity Net Gain be delivered off site?

Yes. BNG can be delivered through a combination of on-site habitat creation or enhancement and registered off-site biodiversity gains.

The August 2026 changes also give minor developments greater flexibility to consider off-site BNG without first prioritising on-site provision.

When does a Biodiversity Gain Plan need to be submitted?

Where mandatory BNG applies, the Biodiversity Gain Plan will generally need to be approved by the local planning authority before development can begin.