Light industrial unit in Wokingham industrial area.

The unit was built in 2012 and is steel portal frame construction with profiled cladding and glass frontages. The unit benefits from an electric roller shutter door, 3 phase power supply and B1/B2/B8 use. The unit has a mezzanine air conditioned office. The unit is going to be refurbished back to market specification by the end of 2021.